Solution Liquimix, pH Value 62 pH, Boiling Point 202 Degree C

Active
Premium

Key Highlights

50 Textile Industry
₹ 2970.00
per Gram (g)
MOQ
1

Available Variants

WhatsApp

Technical Specifications

Parameter Value
pH Value 6.2 pH
Packing Type Bottle
Boiling Point 202 Degree C
Physical Form Liquid
Packaging Size 350 ml
Country of Origin Made in India
Usage/Application Textile Industry
Minimum Order Quantity 50

Product Description

Custom Branded Liquimix Solutions for Textile Printing Durability

Liquimix solution for prolonged durability of ring frame and draw frame rubber cots. Anti lapping solution is a two component compound. Solution, 1 &solution, 2 mixing ratio 13 one measure of solution 1 to three of solution 2 . Mixture must be used within 11/12 hours. Application clean and dry the top rollers ctc or, Thoroughly. Mek petrol may is suitable for cleaning. Better results are achieved if application is performed after grinding. Clamp the top roller in a slow rotating lathe or a grinding machine and apply solution with a brush carefully. Do not allow droplets to be formed appearing outwardly of top rollers. Drying time for solution treated cots 8 hours. During this time, Do not rest the top rollers on their treated surface wax deposits noticed on cots after a few hours working may be gently wiped off by a soft cloth dipped in carbon tetrachloride or petrol. Precautionary measures solution 1 must only be poured slowly into dry containers to avoid splash. Anti lapping solution must be used in a well ventilated room. Always use gloves during application. Gloves are supplied by us. Solution 1 reacts aggressively alcohol and, To water ketonic products. Store anti lapping solution in a cool, Dark place. Application pretreatment process textile processing cartoon packing

Shipping Information

Availability
In Stock
Price
Excluding all taxes
Ships from
Mumbai
Delivery Location
All India delivery available
Shipping
As per delivery location

Seller Information

P
Mumbai, Maharashtra, India
4.7
Rating
98%
Response Rate
Established: 1991
Delivery Time: 15–30 Business Days
Shipping Options:
Air, Sea, Road
View Company Profile

Trust & Safety

Trade Assurance Protected
Secure Payment Methods
Logistics Tracking Available
24/7 Customer Support