Main components 1 x twinlock chamber 300m seawater depth, Twinlock, Asme viii div 1 and abs design code, 10 bed/12 person, Wet, Pot is a tup 1 x integral chamber support frame abs lifting standards and conforms dimensionally to iso 6346 1995 as a type 45go size code, 40 foot high cube dry container. The frame is fitted with external lighting for the chamber complex. A dedicated lifting sling set is included. 1 x hrf sat control & machinery container mounted in a 20 abs freight container. Supplied with modified corner casting to provide slinging points at each top corner. The container is thermally insulated. Machinery includes the main edb, 2 x environmental control units, Ecu 200, A fixed chamber fire fighting system, Internal deluge, 1 x potable water component along with a waste water system. Ups units are supplied for the sat control systems. All connecting umbilicals and power cables connect the chamber complex to the hrf sat control and machinery container.