Buyer pays travel and accommodation costs to/from as well as within the buyer s facility. Buyer puts at his disposal use of overhead cranes or forklifts and auxiliary equipment along with materials needed at installation. Buyer to rigging and, Supply transportation plant service drops within 3, Meter of equipment location. Factory conditions are properly arranged by the buyer in order to guarantee that the installation is possible to accomplish without interruptions. Samco to supply the following line layout drawings. Equipment and all tooling as specified in your quotation. Engineered product drawings. 2 technicians, 1 mechanical & 1 electrical technician. Based on program s complexity, On, Site days to be determined. Precision level and alignment of equipment. All connecting wiring, Equipment inter, Junction boxes, Pneumatics and hydraulic lines. Connecting electric cables between all samco equipment, Panels and consoles. Safety equipment tested. System start up. After, Sales support, Available of spare parts and technical assistance. Customer to provide the following unloading of the trucks and drop equipment to the location. Prepared foundation including embedded anchors, Floor pits and inertia blocks. Electrical disconnect dry compressed, And clean air supply. Power hookup to main cabinet. Service trenches with floor plates as required. Water supply if applicable . Coils to test the line. First filling, Up of the lubrication systems including gear oil. Initial charging of hydraulic system if applicable . Any applicable exhaust hood or ventilation systems. Lifting means for assembly at the customer s facility. Note no special foundation required. Industrial concrete floor min. 150 flat and, Mm thick leveled.