Raw material size Larger Than 25 Mm, Temprature 1350 degree Celsius VSK Portland Cement Plants, Control type PLC
Active
Premium
Key Highlights
₹ 10220000.00
MOQ
1
Available Variants
Technical Specifications
| Parameter | Value |
|---|---|
| Brand | MIPL |
| Voltage | 240 - 320V |
| Capacity | 100 TPD to 1000 TPD |
| Temprature | 1350 degree Celsius |
| Control type | PLC |
| Automatic Grade | Automatic, Semi-Automatic |
| Raw material size | Larger Than 25 Mm |
Product Description
Sustainable Manufacturing Practices in VSK Portland Cement Production
We stand as a top fabricator and overseas exporter of vsk facilities for producing Portland cement Our offering consists of high-quality components quality. The vsk technology serves the purpose of the manufacturing of small, Scale clinkers. The apparatus is compact and straightforward to operate. Raw material percentage lime stone 71, 72%clay black soil 16, 18pet coke 8iron dust 1% if requiredthe vsk technology is designed intended for creation of small, Scale clinkers. The equipment is small and Simple to use. Raw materials the The procedure is segmented into three parts stages 1. Raw materials raw grinding sectionfurnace sectionsection crushing clinkers2. Section grinding to believe entirety of natural components must have a dimension of 25 millimeters, If the dimension The measurement of the raw material exceeds 25 mm, It must be crushed in a pulverizer and a hammer mill. All fundamental resources include crushed is stored in tank farms by discharge the raw, Conveyors. Now materials are transported consistent with their required percentage, Through the support of of belt feeders certificate from plc . The quantified materials are sent to power the belt conveyors and after they are moved, In an elevator in a feed hopper. Power to the the composition is managed through the help of a feeding / feed table ratchet. 3. Section four the storage silo the mixed raw materials are transported to a nebulizer using a screw conveyor. Then liquid is misted on the mixture 10% for that produce nodules with using of the nebulizer. These nodules are introduced inside the furnace through the feed chute to achieve combustion and integration. The material advance at a gradual pace in the oven inside, All the material fuses. After having passed through the combustion zone material slowly starts to cool. The sintering process starts and ultimately the clinker outside of the oven.
Shipping Information
Availability
In Stock
Price
Excluding all taxes
Ships from
Alwar
Delivery Location
All India delivery available
Shipping
As per delivery location
Seller Information
M
Alwar, Rajasthan, India
Established:
2003
Delivery Time:
45–60 Business Days
Shipping Options:
Trust & Safety
Trade Assurance Protected
Secure Payment Methods
Logistics Tracking Available
24/7 Customer Support